Question # 94

Which of the following components is critical for developing a successful water-balance model for WEc2: Enhanced Water Efficiency, Option 1. Whole-Project Water Use?

Options:

A.

Identify all end uses within the project scope, including fixtures and fittings

B.

Prioritise alternative water sources to offset overall water demand

C.

Require equipment specifications to align with the contract documents

Buy Now
Question # 95

Which of the following contributes to the value of the commissioning process?

Options:

A.

Ensuring that the project budgetary goal is met

B.

Verifying that the building systems perform as intended

C.

Verifying that the building water fixtures are installed properly

D.

Ensuring that the project is delivered to meet the permitting requirements

Buy Now
Question # 96

Which item is included in the reuse calculation for MRc1: Building and Materials Reuse?

Options:

A.

Roofing membranes

B.

Asbestos insulation

C.

Floor decking

D.

Exterior glazing

Buy Now
Question # 97

Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the conventional approach for rainwater management by

Options:

A.

replicating a site ' s natural hydrology

B.

discharging rainwater at a faster rate

C.

increasing a site ' s impervious surface

D.

providing a greater volume of rainwater detention

Buy Now
Question # 98

A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?

Options:

A.

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Indoor Water Use Reduction

B.

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Outdoor Water Use Reduction

C.

Sustainable Sites Credit, Rainwater Management and Water Efficiency Credit, Indoor Water Use Reduction

D.

Sustainable Sites Credit, Rainwater Management and Water Efficiency Prerequisite, Indoor Water Use Reduction

Buy Now
Question # 99

A consultant specifies the required U-value, solar heat gain coefficient, and visible light transmittance for a project. What type of building envelope assembly would require these attributes?

Options:

A.

Floors

B.

Roofs

C.

Walls

D.

Windows

Buy Now
Question # 100

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building ' s location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility ' s project scope. The new building project needs to complete a new Phase I ESA if

Options:

A.

the Phase II ESA uncovers suspected contamination

B.

contamination was identified by the certified facility

C.

the certified facility ' s Phase I ESA is older than 180 days

D.

the local equivalent standard is more stringent than ASTM E1527-05

Buy Now
Question # 101

Which strategy should be employed to improve daylighting when designing a new building?

Options:

A.

Increase the building depth

B.

Increase the number of skylights

C.

Increase the height of interior partitions

D.

Decrease the number of exterior light shelves

Buy Now
Question # 102

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.

Measure densities within a 1/4 mi. (0.40 km) radius of the project boundary

B.

Measure densities within a 1/2 mi. (0.80 km) radius of the project boundary

C.

Measure densities within a 1/3 mi. (0.53 km) radius of the project boundary

D.

Measure densities within a 3/4 mi. (1.20 km) radius of the project boundary

Buy Now
Question # 103

The Lakeside Resort is located approximately 60 mi. (96.6 km) from the nearest town. Occupants are expected to arrive primarily by automobile, and existing public transportation consists of approximately one bus trip per day.

The project wants to earn as many Location and Transportation (LT) credits as possible. Which of the following strategies helps achieve points under LTc3: Compact and Connected Development, Option 2. Access to Transit?

Options:

A.

Offer a private shuttle that runs occupants into the nearest town and to local attractions with a minimum three-year commitment. Build a covered transit shelter for occupants to use while they wait for the shuttle.

B.

Implement a carpool incentive program that gives guests and employees incentives to carpool to the project and from the project to local attractions and into town.

C.

Count the bus trip(s) from the project to the local town and the bus trips occupants can connect with once they are in town. The project anticipates 70 possible rides per day on weekdays and 27 on weekends with all bus options combined.

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED v5 AP BD+C)
Last Update: Oct 9, 2026
Questions: 454
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$25.5  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$28.5  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$40.5  $134.99