LEED-AP-BD+C Exam Dumps - USGBC Leadership in Energy and Environmental Design (LEED) Questions and Answers

Question # 94

Which of the following actions is aligned with EQc3: Accessibility and Inclusion?

Options:

A.

Provide lactation rooms or lactation pods

B.

Install automated door systems for all entryways

C.

Incorporate visual contrast between architectural elements

Buy Now
Question # 95

The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

Options:

A.

At the main entrance, 10 ft. (3 m) from the door

B.

At the main entrance, 25 ft. (7.5 m) from the door

C.

At the main entrance and the two service entrances, 10 ft. (3 m) from the doors

D.

At the main entrance and the two service entrances, 25 ft. (7.5 m) from the doors

Buy Now
Question # 96

How much value would these two doors contribute toward Material and Resources Credit, Building Product Disclosure and Optimization – Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

Options:

A.

$150.00

B.

$50.00

C.

$100.00

D.

$125.00

Buy Now
Question # 97

Which of the following is required when documenting a LEED Pilot credit?

Options:

A.

Compliance letter

B.

LEED AP approval

C.

Innovation narrative

D.

Pilot Credit registration

Buy Now
Question # 98

Which of the following are control measures recommended by the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) for the Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan?

Options:

A.

Source control

B.

Material selection

C.

Contractor training

D.

Pre-construction meeting

Buy Now
Question # 99

Which of the following categories is included in a human impact assessment for LEED projects to guide planning, design, and operations?

Options:

A.

Historical landmarks

B.

Demographics

C.

Soil composition

Buy Now
Question # 100

A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?

Options:

A.

Use ground source heat pump

B.

Install efficient plumbing fixtures

C.

Ergonomics design for classrooms and computer rooms

D.

Purchase all materials locally to minimize road transportation

Buy Now
Question # 101

A project team is considering implementing a strategy that has previously been awarded as an Innovation credit on another project. Which actions should be followed if the project team wishes to gain formal pre-approval of the same strategy on the new project?

Options:

A.

Consult the LEED Administrator for the previous project

B.

Submit a Project Credit Interpretation Request (CIR) to GBCI

C.

Submit to Green Business Certification Inc. (GBCI) as-is

D.

The project is ineligible for an Innovation credit

Buy Now
Question # 102

The maximum number of points for Water Efficiency Credit, Cooling Tower Water Use can be obtained by

Options:

A.

utilizing a once-through system without recirculation

B.

limiting cooling tower make-up to 50% of a potable source

C.

conducting a one-time potable water analysis to determine acceptable non-potable sources

D.

achieving a minimum of 10 cooling tower cycles by increasing the level of make-up water treatment

Buy Now
Question # 103

When measuring sound pressure levels in a classroom to determine compliance with the HVAC background noise requirements of LEED Building Design and Construction: Schools, Indoor Environmental Quality Prerequisite, Minimum Acoustic Performance, what testing conditions are appropriate for the classroom?

Options:

A.

Furnished, teacher speaking, HVAC operating at maximum flow rates

B.

Unfurnished, teacher speaking, HVAC operating at typical level

C.

Furnished, no occupants, HVAC operating at typical level

D.

Unfurnished, no occupants, HVAC operating at maximum flow rates

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: Aug 24, 2026
Questions: 404
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$25.5  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$28.5  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$40.5  $134.99