Question # 134

Operable windows contribute to resilient planning and design in extreme climate conditions by:

Options:

A.

Increasing the thermal mass of the building for heat retention

B.

Allowing natural ventilation to improve indoor air quality

C.

Facilitating seasonal thermal adaptation for occupants

Buy Now
Question # 135

What type of space should a project team ensure is made available in order to attain the Sustainable Sites Credit, Joint Use of Facilities, Option 1: Make Building Space Open to the General Public?

Options:

A.

Locker rooms

B.

Office of the principal

C.

Health clinic

D.

Auditorium

Buy Now
Question # 136

In a large industrial or commercial building, which energy end uses are classified as systems composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering?

Options:

A.

HVAC air system for air conditioning

B.

Electrical lighting system during peak use hours

C.

Water flow system used for public faucets and toilets

D.

Condenser water system with a cooling tower and condenser water pumps

Buy Now
Question # 137

A project team wants to educate the facility manager on the installed building systems to improve Indoor Environmental Quality. They want the facility manager to maintain the systems so that they will continue to function as intended. Which of the following should be provided to the facility manager?

Options:

A.

Vendor invoices for mechanical equipment

B.

Preventive maintenance plan for the building

C.

As-built drawings and copies of material submittals

D.

A copy of the credit documentation for the credits that were approved by Green Business Certification Inc. (GBCI)

Buy Now
Question # 138

A project pursuing LEED BD+C certification is designed with an electric air-source heat pump as the primary heating system to meet EAp1: Operational Carbon Projection and Decarbonization Plan. However, the client is considering adding a small natural-gas boiler for backup heating during extreme weather.

To earn maximum points under EAp1 while maintaining heating-system reliability, what should the LEED AP recommend regarding supplemental heating?

Options:

A.

Design an all-electric supplemental heating system using electric-resistance elements or auxiliary heat-pump capacity to eliminate on-site fossil-fuel combustion

B.

Install a natural-gas boiler with automated controls that limit operation to extreme conditions and include provisions for future conversion to an all-electric system

C.

Implement a wood-pellet biomass boiler as secondary heating because it qualifies as carbon-neutral without penalizing on-site combustion

Buy Now
Question # 139

What is the maximum number of points a project pursuing LEED for New Construction can achieve under Location

and Transportation Credit, Access to Quality Transit?

Options:

A.

Two points

B.

Three points

C.

Four points

D.

Five points

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED v5 AP BD+C)
Last Update: Nov 23, 2026
Questions: 454
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$22.5  $89.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$25  $99.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$35  $139.99