Question # 74

Within the Indoor Environmental Quality credit category, which of the following design strategies can be used to enhance building resilience to extreme temperatures?

Options:

A.

External shading devices

B.

Tinted skylights

C.

High-performance glazing

Buy Now
Question # 75

A vegetated roof contributes to earning which of the following credits?

Options:

A.

Sustainable Sites Credit, Heat Island Reduction

B.

Location and Transportation Credit, Sensitive Land Protection

C.

Sustainable Sites Credit, Site Assessment

D.

Sustainable Sites Credit, Light Pollution Reduction

Buy Now
Question # 76

Under LTc3: Compact and Connected Development, Option 1. Surrounding Density, how far from the project site should project teams measure surrounding density?

Options:

A.

0.5 mi. (0.80 km)

B.

1 mi. (1.61 km)

C.

0.25 mi. (0.40 km)

Buy Now
Question # 77

A project will renovate a building with historic designation into new office space. The surface area of the existing building structure and envelope is 100,000 ft² (9,290 m²). How much of the existing building will need to be reused to earn 5 points for the Materials and Resource Credit, Building Life-Cycle Impact Reduction?

Options:

A.

90,000 ft² (8,361 m²)

B.

There is no minimum

C.

80,000 ft² (7,432 m²)

D.

At least 50% of the surface area

Buy Now
Question # 78

Sustainable Sites Credit, Site Assessment requires evaluation of

Options:

A.

soils, archeology, hydrology

B.

topography, hydrology, human use

C.

vegetation, topography, archaeology

D.

human health effects, climate, land value

Buy Now
Question # 79

The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?

Options:

A.

0.144 CFM/ft2 (0.73 (L/s)/m2)

B.

0.156 CFM/ft2 (0.79 (L/s)/m2)

C.

0.168 CFM/ft2 (0.85 (L/s)/m2)

D.

0.30 CFM/ft2 (1.5 (L/s)/m2)

Buy Now
Question # 80

Questions 1–5 are based on the same project scenario. Please use the scenario information when answering.

A hospital certified under LEED V5 in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project design and the credit options that the project team may attempt, what is the highest LEED certification level that can be achieved?

Options:

A.

Platinum

B.

Gold

C.

Silver

Buy Now
Question # 81

What nonroof measure contributes to the achievement of Sustainable Sites Credit, Heat Island Reduction, Option 1. Nonroof and Roof?

Options:

A.

Use a high reflectance roof finish

B.

Install artificial turf

C.

Locate a minimum of 75% of parking spaces under cover

D.

Provide shade with structures covered by energy generation systems

Buy Now
Question # 82

Which of the following actions should be taken to ensure that project teams understand and prioritize the selection of materials compliant with the Materials and Resources Credit, Building Product Disclosure and Optimization?

Options:

A.

Include the material requirements in the project specifications

B.

Select locally sourced and manufactured materials

C.

Include all building materials in a whole-building life-cycle analysis

D.

Procure materials directly from raw material suppliers

Buy Now
Question # 83

Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?

Options:

A.

Retail

B.

Hospitality

C.

Core and Shell Development

D.

New Construction

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: Aug 24, 2026
Questions: 404
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$25.5  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$28.5  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$40.5  $134.99