Question # 64

A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED

AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?

Options:

A.

Airport flyover maps, mechanical plans, wall sections

B.

Patient records, wall sections, ceiling panel cut sheets

C.

Occupancy statistics, patient records, MRI machine specifications

D.

MRI machine specifications, mechanical plans, occupancy statistics

Buy Now
Question # 65

When should collaboration start for the integrative process?

Options:

A.

Before finalizing the design

B.

During predesign

C.

Before competitive project bidding

D.

Before construction

Buy Now
Question # 66

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Buy Now
Question # 67

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

Options:

A.

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.

The project team need not do anything as GBCI already marked it as an "anticipated" credit

Buy Now
Question # 68

A neighborhood housing development organization has dual goals, promoting occupant's health and minimizing

energy costs. What LEED Building Design and Construction, New Construction credit might the LEED AP propose to best achieve the organization's dual goals?

Options:

A.

Location and Transportation Credit, Access to Quality Transit

B.

Energy and Atmosphere Credit, Optimize Energy Performance

C.

Indoor Environmental Quality Credit, Low Emitting Materials

D.

Indoor Environmental Quality Credit, Daylight

Buy Now
Question # 69

For schools intended for grades eight and below (or ages 14 and below), which of the following scenarios would demonstrate compliance with Location and Transportation Credit, Access to Quality Transit, Schools, Option 2. Pedestrian Access?

Options:

A.

30% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

B.

50% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

C.

30% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

D.

50% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

Buy Now
Question # 70

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?

Options:

A.

Municipally supplied tap water

B.

Ground surface stormwater runoff

C.

Rainwater collected from the building roof

D.

Graywater from the building's hand-washing sinks

Buy Now
Question # 71

An HVAC system consists of an air handler supplying conditioned air (mixture of return air and outdoor air) to an office, corridor, conference room and lobby. For Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance, the ventilation rate procedure calculations must be based upon what HVAC system configuration?

Options:

A.

Single-zone system

B.

Multiple-zone system

C.

Mixed-mode system

D.

100% outdoor air system

Buy Now
Question # 72

In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?

Options:

A.

Zero

B.

One

C.

Two

D.

Three

Buy Now
Question # 73

A new athletic facility contains a laundry room which is adjacent to the locker rooms. Which strategy will contribute toward the Interior Cross-Contamination Prevention strategy in Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

Options:

A.

Relocate the laundry facility to the basement

B.

Naturally ventilate the laundry space per ASHRAE 62.1-2010

C.

Install particle filters, with a MERV of 13 or higher or F7

D.

Provide a ventilation system specifically for the laundry facility that has no recirculating air

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: Aug 24, 2026
Questions: 404
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$25.5  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$28.5  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$40.5  $134.99