Black Friday Mega Drop - Up to 75% Off Best Sellers - Ends in 0d 00h 00m 00s - Coupon code: certbig75

LEED-AP-BD+C Exam Dumps - USGBC Leadership in Energy and Environmental Design (LEED) Questions and Answers

Question # 64

In order to achieve the requirements of LEED, the Electrical Vehicle Supply Equipment (EVSE) must comply with:

Options:

A.

State, but not regional standards established for electrical vehicles operated within the state of vehicle operation

B.

Regional, state, or local standards for the electrical connectors to be used

C.

Level 1 charging capacity (110 volts AC)

D.

Manufacturer ' s standards established for electrical vehicles operated within the state of vehicle primary operation

Buy Now
Question # 65

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in an office restroom

B.

A sink in a school classroom

C.

A sink in a hotel room bathroom

D.

A sink in a shared office restroom

Buy Now
Question # 66

Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.

The general contractor

B.

A LEED AP

C.

The project ' s mechanical engineer

D.

The owner or an owner ' s representative

Buy Now
Question # 67

A project elects to pursue Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses because of the project ' s location in an amenity-rich area. The project features 18 uses overall, including at least four uses in three of the five use type categories. What threshold must the project surpass in order to demonstrate exemplary performance for Option 2?

Options:

A.

Exemplary Performance is not available for Option 2

B.

15 uses, including two uses in each of the five categories

C.

15 uses, including at least one Food Retail and one Community Anchor use

D.

18 uses, including uses in at least four of the five use type categories

Buy Now
Question # 68

For WEp1: Water Metering and Reporting, the intent is to identify opportunities to manage future water savings. Water metering should:

Options:

A.

Include total water consumption for potable and alternative water sources

B.

Include submeters for mechanical equipment

C.

Include only indoor water consumption including manufacturing processes

D.

Provide separate data for indoor and outdoor water consumption

Buy Now
Question # 69

Which system is eligible for the Energy and Atmosphere Credit, Renewable Energy Production?

Options:

A.

Ground-source heat pumps

B.

Tidal-based electrical production

C.

Municipal solid waste combustion

D.

Passive solar and daylighting strategies

Buy Now
Question # 70

In what way can synergies between LEED credits enhance sustainability outcomes on a project?

Options:

A.

Use low-emitting materials to optimise energy performance, contributing to Materials and Resources and Energy and Atmosphere credits

B.

Install a green roof to reduce the heat-island effect and improve energy efficiency, contributing to Sustainable Sites and Energy and Atmosphere credits

C.

Choose materials with high recycled content to improve thermal comfort, contributing to Materials and Resources and Indoor Environmental Quality credits

Buy Now
Question # 71

When designing a new building, which of the following strategies can be implemented to accommodate future integration of alternative water sources?

Options:

A.

Install individual water meters for all water-using fixtures

B.

Install dual piping systems to separate potable and alternative water supplies

C.

Implement an economic feasibility study to determine the current viability of alternative water sources

Buy Now
Question # 72

A project team is planning a new office building in a cold climate. The team aims to achieve significant reductions in peak thermal loads. Which strategy should it apply to minimise peak thermal loads associated with infiltration?

Options:

A.

Increase wall-insulation thickness

B.

Install high-performance windows with low-emissivity coatings

C.

Seal potential air-leakage points and openings

Buy Now
Question # 73

Which of the following criteria must a Commissioning Authority (CxA) comply with in order to meet the requirements of the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification of Building Energy Systems?

Options:

A.

Document commissioning authority experience for at least one building project

B.

Review the owner ' s project requirements (OPR) for project goals and expectations

C.

Be a part of the project ' s design and construction management team

D.

Report results, findings, and recommendations directly to the architect

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED v5 AP BD+C)
Last Update: Nov 23, 2026
Questions: 454
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$22.5  $89.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$25  $99.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$35  $139.99