Black Friday Mega Drop - Up to 75% Off Best Sellers - Ends in 0d 00h 00m 00s - Coupon code: certbig75

LEED-AP-BD+C Exam Dumps - USGBC Leadership in Energy and Environmental Design (LEED) Questions and Answers

Question # 104

What is the minimum percentage of gross floor area that must be complete for a project to use LEED BD+C: New Construction and Major Renovations?

Options:

A.

40%

B.

100%

C.

60%

Buy Now
Question # 105

Which of the following credits advocates the values and benefits of green building design and construction as well as outdoor physical activity?

Options:

A.

Sustainable Sites Credit, Light Pollution Reduction

B.

Sustainable Sites Credit, Open Space

C.

Environmental Quality Credit, Quality Views

D.

Location and Transportation Credit, Reduced Parking Footprint

Buy Now
Question # 106

Which of the following Materials and Resources credits or prerequisites is reviewed under the design phase documentation submission?

Options:

A.

PBT Source Reduction - Lead, Cadmium, and Copper

B.

PBT Source Reduction - Mercury

C.

Building Product Disclosure and Optimization - Environmental Product Declarations

D.

Building Product Disclosure and Optimization - Sourcing of Raw Materials

Buy Now
Question # 107

When planning a water-efficient landscape design, the designer should consider including

Options:

A.

potable water

B.

sprinkler system

C.

native vegetation

D.

permeable pavement

Buy Now
Question # 108

When should collaboration start for the integrative process?

Options:

A.

Before finalizing the design

B.

During predesign

C.

Before competitive project bidding

D.

Before construction

Buy Now
Question # 109

What are the three phases within the Integrative Process Credit, Integrative Process?

Options:

A.

Pre-design, Discovery, Design and Construction

B.

Discovery, Design and Construction, Operations and Feedback

C.

Schematic Design, Design and Construction, Operations and Feedback

D.

Design Charrette, Schematic Design, Operations and Feedback

Buy Now
Question # 110

The current facilities requirements (CFR) and operations and maintenance plan (OMP) required for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification must include

Options:

A.

issue logs

B.

functional performance tests

C.

minimum outside air requirements

D.

installation verification (construction) checklists

Buy Now
Question # 111

Which of the following products must always be included in Materials and Resources credits?

Options:

A.

Faucets

B.

Furniture

C.

Interior Paint

D.

Fire suppression system

Buy Now
Question # 112

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project design and the credit options that the project team may attempt, what is the highest LEED certification level that can be achieved?

Options:

A.

Platinum

B.

Gold

C.

Silver

Buy Now
Question # 113

Which of the following design features enhances accessibility for physical diversity in a mixed-use development project?

Options:

A.

Use high-contrast colours for signage and wayfinding

B.

Provide non-text diagrams and symbols for signage

C.

Create meeting spaces that accommodate mobility devices

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED v5 AP BD+C)
Last Update: Nov 23, 2026
Questions: 454
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$22.5  $89.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$25  $99.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$35  $139.99