Question # 104

During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

Options:

A.

Innovation Credit, Innovation

B.

Integrative Process Credit

C.

Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

D.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

Buy Now
Question # 105

Building Product Disclosure and Optimization is based on market

Options:

A.

reliability

B.

durability

C.

transparency

D.

consumption

Buy Now
Question # 106

What Color Rendering Index (CRI) value meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.

45

B.

85

C.

25

D.

65

Buy Now
Question # 107

According to ASHRAE 90.1-2019, small commercial buildings under 25,000 ft² (2,323 m²) require energy monitoring:

Options:

A.

At 15-minute intervals for total project electricity use

B.

At least monthly for submetered end-use electricity

C.

At least monthly for whole-building energy use for each energy source

Buy Now
Question # 108

Which of the following Building Product Disclosure and Optimization credits under the Materials and Resources category would a project team achieve by using insulation material that is cradle-to-cradle V3 Gold certified?

Options:

A.

Material Ingredients, Option 2. Leadership Extraction Practices and Environmental Product Declarations, Option 1. Environmental Product Declarations (EPD)

B.

Material Ingredients, Option 1. Material Ingredient Reporting and Material Ingredients, Option 2. Material Ingredient Optimization

C.

Sourcing of Raw Materials, Option 1. Raw Material Source and Extraction Reporting and Material Ingredients, Option 2. Material Ingredient Optimization

D.

Sourcing of Raw Materials, Option 2. Leadership Extraction Practices and Material Ingredients, Option 2. Material Ingredient Optimization

Buy Now
Question # 109

When following the LEED Building Design and Construction Integrative Process credit, which of the following is the approach for the design team to follow?

Options:

A.

Locate a solid waste provider that has sorting capabilities

B.

Assure the aesthetics will match existing neighborhood conditions

C.

Identify synergies among building systems and equipment

D.

Determine if green vehicles will be applicable to the project

Buy Now
Question # 110

What is a benefit of including the public in a charrette for a new school before the pre-design phase?

Options:

A.

Neighbors can plan for future construction

B.

It will help streamline the permitting process

C.

Potential partnerships with the community can be revealed

D.

The owner can determine financial strategies based on the public's input

Buy Now
Question # 111

During a design charrette, community neighbors raise a concern about potential glare resulting from a project's highly reflective roof. Which change should the LEED AP recommend to best address these concerns without negatively impacting other LEED credits?

Options:

A.

Change the design to incorporate rooftop solar panels

B.

Change the roofing material to a dark material to eliminate the issue

C.

Change the design to reduce the amount of roofing area

D.

Change the design to include a vegetative roofing system

Buy Now
Question # 112

Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to

Options:

A.

earn Water Efficiency Credit, Water Metering

B.

earn Sustainable Sites Credit, Rainwater Management

C.

estimate and optimize water use in landscape designs

D.

estimate and optimize water use in outdoor fountains and pools

Buy Now
Question # 113

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Options:

A.

documenting LEED credits

B.

creating the Basis of Design (BOD)

C.

developing the LEED Scorecard

D.

implementing the Commissioning (Cx) Plan

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: Aug 24, 2026
Questions: 404
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$25.5  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$28.5  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$40.5  $134.99