Question # 104

In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?

Options:

A.

Zero

B.

One

C.

Two

D.

Three

Buy Now
Question # 105

In pursuit of the Materials and Resources Credit, Building Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, which of the following statements is true related to products purchased for temporary use (formwork, bracing and scaffolding) on the project?

Options:

A.

Temporary wood products cannot be included in the calculations

B.

If any temporary wood materials are included in the calculation, all wood materials must be included in the calculation

C.

Only Forest Stewardship Council (FSC)-certified wood materials are included in the calculation; non-certified wood materials contribute to other credits

D.

FSC-certified wood materials purchased for more than one project can be applied to other projects seeking LEED Certification

Buy Now
Question # 106

The Water Efficiency Prerequisite, Outdoor Water Use Reduction requires a reduction over a baseline that is calculated for the site:

Options:

A.

Over the entire year

B.

For the watering month

C.

For the average watering month

D.

Over the driest three-month portion of the year

Buy Now
Question # 107

Large commercial buildings are most often dominated by

Options:

A.

internal loads

B.

lighting loads

C.

external loads

D.

envelope loads

Buy Now
Question # 108

Commissioning (Cx) and verification are requirements to qualify for LEED certification. What are the basic systems that need to be commissioned?

Options:

A.

Electrical, Mechanical, Plumbing, and Renewable Energy

B.

Electrical, Structural, Mechanical, and Lighting

C.

Electrical, Structural, Audio Visual, and Envelope

D.

Electrical, Plumbing, Telecommunications, and Fire Suppression

Buy Now
Question # 109

How can a building owner promote both energy efficiency and thermal comfort in a building?

Options:

A.

Survey occupants about their comfort on a regular basis

B.

Provide occupants with individual space heaters in the winter

C.

Ask the cleaning contractor to turn off all of the lights after cleaning

D.

Institute a flexible dress code that permits seasonally appropriate clothing

Buy Now
Question # 110

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

Options:

A.

Site Development-Protect or Restore Habita

B.

Site Assessment

C.

Heat Island Reduction

D.

Light Pollution Reduction

Buy Now
Question # 111

A mixed-use development is located 1/2 mi. (0.80 km) from a future commuter rail line station. Which of the following pieces of information is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit?

Options:

A.

Discounted rail pass availability

B.

Rail line station construction completion date

C.

Connections to transfer routes

D.

Passenger capacity

Buy Now
Question # 112

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team ' s top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Buy Now
Question # 113

For IPp2: Human Impact Assessment, the team wants to use the ground-floor spaces to achieve both social equity and occupant experience. Which design features would achieve this dual objective?

Options:

A.

Designing public retail space as a café with seating in an adjacent plaza

B.

Locating the building 0.25 mi. (0.40 km) from a subway stop and providing secure bicycle storage

C.

Installing MERV-13 filters in all residential units and using low-VOC paint in the retail spaces

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED v5 AP BD+C)
Last Update: Oct 9, 2026
Questions: 454
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$25.5  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$28.5  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$40.5  $134.99