Question # 24

During a design charrette, community neighbors raise a concern about potential glare resulting from a project ' s highly reflective roof. Which change should the LEED AP recommend to best address these concerns without negatively impacting other LEED credits?

Options:

A.

Change the design to incorporate rooftop solar panels

B.

Change the roofing material to a dark material to eliminate the issue

C.

Change the design to reduce the amount of roofing area

D.

Change the design to include a vegetative roofing system

Buy Now
Question # 25

What is the first step to earn the Water Efficiency Credit, Cooling Tower Water Use?

Options:

A.

Select air-conditioner condensate for cooling

B.

Calculate cycles of concentration

C.

Identify the maximum number of cycles for the cooling tower or evaporative condenser

D.

Engage a water treatment professional to perform a chemical analysis

Buy Now
Question # 26

A school wants to incorporate natural daylighting in classrooms on all sides of the building. What can the project design team explain to the school district about how this strategy will affect the operational energy cost?

Options:

A.

Heat gain will reduce the air conditioning load

B.

Having the lights off reduces the electricity use

C.

Reduction in lighting fixture use reduces re-lamping

D.

There would be passive solar heating benefits to all of the classrooms

Buy Now
Question # 27

When designing a building that includes Electric Vehicle Supply Equipment (EVSE), which capability is needed to ensure maximum energy efficiency and cost savings?

Options:

A.

Install EVSE that operates only during peak hours to ensure availability

B.

Integrate EVSE with demand-response programs and load-management strategies

C.

Install Level 1 charging stations with 120-volt service for all spaces

Buy Now
Question # 28

What type of space should a project team ensure is made available in order to attain the Sustainable Sites Credit, Joint Use of Facilities, Option 1: Make Building Space Open to the General Public?

Options:

A.

Locker rooms

B.

Office of the principal

C.

Health clinic

D.

Auditorium

Buy Now
Question # 29

Which of the following strategies can be used to decrease the envelope load of a building?

Options:

A.

Provide summer solar shading

B.

Maximize daylighting

C.

Decrease opaque wall area

D.

Use economizers for free cooling

Buy Now
Question # 30

When should collaboration start for the integrative process?

Options:

A.

Before finalizing the design

B.

During predesign

C.

Before competitive project bidding

D.

Before construction

Buy Now
Question # 31

Which of the following is omitted from the assessment while performing preliminary energy modeling?

Options:

A.

Massing and orientation

B.

Thermal comfort ranges

C.

Supply sources

D.

Plug and process loads

Buy Now
Question # 32

Water Efficiency Prerequisite, Outdoor Water Use Reduction, Option 2. Reduced Irrigation, requires that a project ' s landscape water requirement be reduced by what percentage from the calculated baseline for the project site ' s peak watering month?

Options:

A.

20%

B.

25%

C.

30%

D.

40%

Buy Now
Question # 33

Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

Options:

A.

Owner

B.

Contractor

C.

Occupants

D.

Facility manager

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED v5 AP BD+C)
Last Update: Oct 9, 2026
Questions: 454
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$25.5  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$28.5  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$40.5  $134.99