Question # 14

A project's massing and site orientation can have a direct impact on which of the following prerequisites?

Options:

A.

Minimum Energy Performance

B.

Minimum Indoor Air Quality Performance

C.

Construction Activity Pollution Prevention

D.

Fundamental Commissioning and Verification

Buy Now
Question # 15

Which group of chemicals emitted by some building materials is linked to asthma, chronic obstructive pulmonary disease, and cancer?

Options:

A.

Nitrogen Oxides (NOx)

B.

Polyvinyl Chlorides (PVCs)

C.

Chlorofluorocarbons (CFCs)

D.

Volatile Organic Compounds (VOCs)

Buy Now
Question # 16

In new construction projects, EQc4: Resilient Spaces allows designs to earn points from which of the following management modes?

Options:

A.

Seismic risks

B.

Hurricane and tornado risks

C.

Infection risks

Buy Now
Question # 17

Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

Options:

A.

Split Review

B.

Appeal Review

C.

Expedited Review

D.

Credit Interpretation Ruling

Buy Now
Question # 18

An owner has requested that the project team redesign a large office building. As part of the redesign, the owner would like to move the main entrance to the opposite side of the building. Achievement of which credit may be affected by the move?

Options:

A.

Location and Transportation Credit, High-Priority Site

B.

Location and Transportation Credit, Sensitive Land Protection

C.

Location and Transportation Credit, Surrounding Density and Diverse Uses

D.

Location and Transportation Credit, LEED for Neighborhood Development Location

Buy Now
Question # 19

Which of the following pairs of strategies can help reduce the landscape water demand beyond the prerequisite level in Water Efficiency Credit, Outdoor Water Use Reduction?

Options:

A.

Mulched paths and weather sensor controls

B.

Artificial turf grass and alternative water sources

C.

Plant species selection and permeable pavement

D.

Alternative water sources and smart scheduling technology

Buy Now
Question # 20

An office building design has demonstrated reductions in landscape water use of 30% over baseline and indoor water use of 40%. These reductions qualify the project for:

Options:

A.

Four points for Water Efficiency Credit, Indoor Water Use Reduction

B.

Zero points because the Water Efficiency Prerequisites are not met

C.

One point for Water Efficiency Credit, Outdoor Water Use Reduction

D.

One point for Water Efficiency Credit, Outdoor Water Use Reduction and four points for Water Efficiency Credit, Indoor Water Use Reduction

Buy Now
Question # 21

Which of the following would be classified as a public use faucet?

Options:

A.

Patient room sink

B.

Hotel sink

C.

Dorm room sink

D.

School classroom sink

Buy Now
Question # 22

Under the Energy and Atmosphere Credit, Optimize Energy Performance, what method should display lighting use for establishing allowable lighting power?

Options:

A.

The square-footage-of-usable-space method

B.

The space-by-space method

C.

Glare rating index method

D.

Seasonal usage peaks method

Buy Now
Question # 23

Which of the following is a source reduction strategy to eliminate waste produced by a project?

Options:

A.

Custom design

B.

Design-build

C.

Material science

D.

Prefabrication

Buy Now
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: Aug 24, 2026
Questions: 404
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$25.5  $84.99
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$28.5  $94.99
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$40.5  $134.99